January 2014 (cont.)

On to a bit of plumbing. With most of the stud work now complete, we could crack on with laying the underfloor heating for the first floor. This is made up of an ‘overboard’ system supplied by www.wundafloorheating.co.uk  Very easy to fit, just a bit fiddly to cut the boards to make the tricky pipe runs.

Image

ImageImageImage

A sheet of 6mm ply is then fitted over the board and the pipes. Ready for the carpet to be laid later on.

A couple of pics from the attic rooms now, the ‘man cave’ now has all the stud work in place, including the stud wall that will house the TV and all the other electrical wizardry. We also thought it’d be a good idea to put one of the extractors for the heat recovery system in there (behind the stud wall that houses the TV) as it’s bound to get quite warm with all the various pieces of equipment.  My wife has now claimed the other room as hers, so the rooms are all now spoken for!

ImageImage

The Mechanical Heat Recovery and Ventilation Unit is a bit of a beast, it’s going to have a large cupboard all to itself! Should be tucked nicely out the way though – looking forward to connecting that up as I’ve not done one of these units before.

Most of the first fix for the plumbing work is now done, approximately 70% of the way through it. The last bit to do is fit all of the ground floor underfloor heating. But before we can lay all the pipe work for that, we need to lay a thick damp proof membrane, followed by 150mm of insulation, then a vapour check barrier, THEN the pipe work can finally be laid! This will all happen next month – stay tuned as we’ll nearly be up to date – wooooooooooooo.

Advertisements

January 2014

Haaaaaaaaaaappy New Year! Where did that last year go? The same place as the one before, the past! Anyway, I hope you all had a great Christmas. Let’s build a house – crack on!

Where were we? Ah yes, insulating the roof space. After doing a day in here, I started to resemble a snow man! This stuff gets everywhere! 

Image

This was a thankless task, especially trying to fit it in around my own work. Luckily we had a helping hand to save the day (thanks Colin!) A look out of the Velux window soon gave me that motivational kick up the arse, what a lovely view. We can’t wait to be greeted with this every day.

Image

 

The site got a little bit damp during the heavy rain we had in January (side note – nothing in comparison to those currently suffering in Somerset – Feb’14). This was mainly down to not having the drainage in place yet or the guttering terminating into the storm drain. (This will be done if it ever stops raining).

ImageImage

 

Back to the inside of the house now. Tom started cracking on with the stud walls. We could now get a feel of the size of the rooms. It’s all starting to take shape.

Image

 

Tom was very busy this month, him and Clint then got the roof fitted to the bay window, this took some doing, thanks guys! 

Image

 

Fiiiiiiiiiiiiiinally, I get to start the plumbing, well, sort of plumbing! Myself, Andy and Ant got all the ducting in place for the mechanical heat recovery and ventilation. Here comes a techy bit! Most of the manufacturers usually supply the ducting in 150mm diameter, this posed a problem for us, as our ‘easy-joist’ system only had gaps of 110mm. Luckily, Dan@AdaptEnergy managed to source a kit with 75mm ducting, so that solved that problem – thanks Dan! That’s the end of the techy bit – phew!

ImageImageImage

 

A stairway to heaven (heaven being the man-cave).

Image

 

I’ll split this blog into two parts – for two reasons:-

  1. I haven’t been very organised, and I’ve not uploaded the rest of the pictures from my phone to the iCloud (whatever that is!)
  2. We’ll soon be up to date and I’ll run out of things to say!! (stop cheering!)

See you all next time!